Do you know how long it takes to lay brick? A long time!
It’s a tedious process that involves prepping the wall, mixing the concrete, measuring and leveling rows, trimming bricks to their proper size, spreading the concrete, laying the bricks, waiting for them to settle, and then cleaning up the excess concrete. Row, by row, by row.
We are thrilled with the work of our architects and builders. It has been a joy to watch them transform our school building a little more each day, working tirelessly in 32° C (90° F) weather.
Enrollment is still open for ages 3-6. Call or visit us today!
Arbor Christian Academy
(809) 588-7925
Calle Principal #34
Urb. Los Maestros
San Francisco de Macorís, RD